Fish Exclusion Systems
![]() |
| Fish Exclusion System Under Construction |
|
Since 1998, Dominion has undertaken contracts for major fish exclusion systems for Manitoba Hydro at its Selkirk and Brandon thermal generating stations and for Shell Canada at its refinery in Fort Saskatchewan, Alberta. |
![]() |
| Moving Fish Exclusion System |
|
The Department of Fisheries and Ocean's specifications for new water intakes require that structure openings be no larger than 1.75 mm. Therefore, fabrication tolerances are critical and pinpoint accuracy is essential in installation. |
Dominion Divers has successfully met these challenges.


