Take a Deep Dive Into Our Work
Take a Deep Dive Into Our Work

Our Projects

Dominion Divers has a long history of understanding and satisfying the needs and challenges of a deep list
of clients. Over our nearly 60 years in business, we have built up an extensive and diverse resume of underwater
projects of all kinds. From cofferdam installations and detailed high-level inspections of all kinds of structures,
to water intake and marine pipeline installations and bridge and dam rehabilitation projects, we have the people,
experience, tools, and equipment to meet and solve the challenges of any project below and above the waterline!

St. Andrews Lock & Dam St. Andrews Lock & Dam

Underwater demolition and concrete repair to rehabilitate the piers located at St Andrews Lock and Dam in Lockport, Manitoba.

Powell River Trash Rack Powell River Trash Rack

Removal and replacement of trash rack system and structure at the headworks of a hydro-electric facility to meet industry standards.

Noden Causeway Noden Causeway

The polymer encapsulation and repair of 1,125 steel tube piles of the 5.6-kilometer-long Noden Causeway which crosses Rainy Lake.

Morrison Dam, East Poplar River, Coronach, SK Morrison Dam, East Poplar River, Coronach, SK

Dredged material to prepare for the installation of a new HDPE liner for a water control structure and cemented the new liner in place.

Gas Pipeline, Red River, Selkirk, MB Gas Pipeline, Red River, Selkirk, MB

Installation of 56 erosion control blankets, weighing 3,600 kg each, for the protection of a natural gas pipeline crossing in St. Clements, MB.

Bulk Bag Cofferdam Installation, Tazin Lake, SK Bulk Bag Cofferdam Installation, Tazin Lake, SK

Installation of a bulk bag cofferdam using a floating crane system in a remote location with winter road and fly-in access only.